Our extensive resume is comprised of over 3,500 projects completed




This Project scope was to Provide a Site Survey, Type III Work Plan and Construction to Replace two existing engine generator sets with three 2,250 Kw generators, including new remote radiators; fuel system modifications as required; existing power house structure modification, the “swing” generator and auxiliary equipment and the removal of existing equipment rendered obsolete. The work under this task order will not interfere with operation of existing systems for daily hospital operation. Work involves the critical emergency electrical backup system for the entire hospital, installation of three new 2,250 Kw emergency power generator replacements. Additionally, the replacement effort faces one major environmental challenge: the area surrounding Bldg 137 has been designated as a natural habitat for the endangered Damselfly by the State of Hawaii, Department of Land and Natural Resources (DLNR).
Tripler Army Medical Center, Hawaii
Client
US Army
Date
June 2020
Category
Construction
Related Projects

Andrews Air Force Base, Maryland
This project consisted of the removal and replacement of approximately 125,000 square feet of 14” thick poured-in-place concrete pavement.

Carl R Darnall ACH; Ft. Hood, TX
Welcome to the new generation of dining facility design for the Army Medical Department. This Project was to upgrade Nutrition Care Directorates located at Fort Campbell.

McDonald ACH Ft. Eustis NCD
This Project was to provide a Site Survey Report, Type III Work Plan and Renovation of Nutrition Care Directorates located at Fort Campbell.

Evans Army Community Hospital, Fort Carson, Colorado
This design/build project involved the renovation and upgrade of the approximately 40,000 SF on the third floor of Evans Army Community Hospital.

Design/Build Veterinary Clinic, Fort Carson, Colorado
The scope of this project was to design build a new 5500 SF Veterinary Clinic. The new facility features state of the art surgical suites and five exam rooms.

Tripler Army Medical Center, Hawaii
This Project scope was to Provide a Site Survey, Type III Work Plan and Construction to Replace two existing engine generator sets with three 2,250 Kw generators